Construction Scheduler

BB&E· 000400 - EVERGREEN
Apply Now ↗
📍 Honolulu, Hawaii, United StatesFull time💰 USD 143K–185K

About this role

BB&E is an employee-owned, full-service civil and environmental engineering and consulting firm, headquartered in Northville, Michigan, which services both the Federal and Industrial sectors throughout the United States. BB&E team members provide Environmental Consulting, Facilities Engineering, and Program/Project Management Services to the Federal and private sectors. 

Position Summary 

BB&E is seeking a dynamic and detail-oriented Scheduler to join our team, supporting the U.S. Army Corps of Engineers (USACE) Honolulu District (POH) Programs & Project Management Division (PPMD) by developing and maintaining resource-loaded Critical Path Method (CPM) schedules in Primavera P6 for an upcoming surge of FY27 projects. Work will be performed on-site at USACE Honolulu District facilities in Honolulu, HI, using Government-furnished computers. This position is contingent upon contract award. 

Job Duties & Responsibilities 

  • Input resource loaded Critical Path Method (CPM) schedules into Primavera P6 
  • Enter, monitor, and update resource loaded schedules 
  • Conduct resource analysis and critical path analysis, identifying any resulting impacts or opportunities for Government consideration 
  • Develop all schedules using a modernized Program and Project Management Information Suite (PROMIS) (Primavera Project Manager/P6 Web), Corps of Engineers Financial Management System (CEFMS), and RMS 
  • Run reports in Primavera and develop reports using MS Power BI and other MS applications 

Key Qualifications 

  • U.S. Citizenship and the ability to obtain/maintain a NACI/CAC is required 
  • Primavera P6: Proficiency in Primavera P6, with the ability to work independently in the software from day one, is required 
  • Reporting: Experience running reports in Primavera and experience using MS Power BI and other MS applications to develop reports is required 
  • Strong Communication Skills: Ability to effectively communicate both orally and in writing 
  • Experience: Fifteen (15) or more years of total relevant experience is required. In addition, a minimum of three (3) full years of experience using Primavera Project Manager/P6 to manage and update resource-loaded CPM project schedules is required 

Physical Requirements 

  • Ability to stand/walk/climb/kneel/crouch and remain in a stationary position/sit at least 60% of the time 
  • Ability to operate office equipment, including a computer, copy machine, phone, etc. 
  • Ability to use hands to finger, handle, or feel objects or controls; reach with hands and arms 
  • Capable of lifting up to 10 lbs. 
  • Ability to see details of objects that are less than a few feet away 
  • Ability to understand the speech of another person, speak clearly so listeners can understand, and talk or hear both in person and by telephone 
  • Competitive compensation packages. $143,000-$185,000 annually. This range represents good-faith compensation for the position at the time of posting. Individual compensation is determined based on several factors, including job responsibilities, relevant experience, education, certifications, technical skills, security clearance status, geographic location, market conditions, internal equity, and contract-specific requirements. 
  • Participation in the Employee Stock Ownership Plan – BB&E is 100% employee-owned! 
  • Discretionary bonus 
  • *Medical, Dental, and Vision Insurance with health care concierge 
  • *Employer provided Short-Term & Long-Term disability 
  • *Employer provided Life insurance 
  • *Employee options for supplemental life, supplemental accident, critical illness, hospital indemnity, and Identity theft protection benefits 
  • *Generous PTO plus 11 paid holidays 
  • Traditional & Roth 401(k) options with fully vested employer match 
  • Tuition reimbursement & professional development 
  • Employee referral program 
  • Financial wellness resources 
  • Employee discounts 
  • Employee Assistance Program (EAP) 
  • Pet insurance discount 

*Applies only to full-time employees 

 

*BB&E is an Equal Opportunity Employer and an Affirmative Action Employer.  All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, or status as a protected veteran. 

BB&E supports pay transparency and is committed to equitable and competitive compensation practices. Compensation for this role will be determined based on several factors, including job responsibilities, relevant experience, education, certifications, technical skills, security clearance status, geographic location, market conditions, internal equity, and contract-specific requirements. Where required by law, compensation ranges will be provided to candidates during the hiring process. 

Frequently Asked Questions

What is the salary for the Construction Scheduler role at BB&E?
The listed salary for this Construction Scheduler position at BB&E is USD 143K–185K. This is an Full time role.
Where is the Construction Scheduler position at BB&E located?
This Construction Scheduler role at BB&E is based in Honolulu, Hawaii, United States. The position is listed as on-site or hybrid. Check the full job description or apply directly to confirm the work arrangement.
Is the Construction Scheduler role at BB&E full-time or part-time?
This is listed as a Full time position. It is posted as a Construction Scheduler role in the 000400 - EVERGREEN department at BB&E.
Which team or department does the Construction Scheduler at BB&E belong to?
This Construction Scheduler position is part of the 000400 - EVERGREEN department at BB&E. See the full job description for more information about the team structure and responsibilities.
How do I apply for the Construction Scheduler position at BB&E?
Click the "Apply Now" button on this page. You will be redirected to BB&E's official application portal hosted on workable where you can submit your application directly.
When was the Construction Scheduler job at BB&E posted?
This Construction Scheduler position at BB&E was posted on Jul 15, 2026. Apply as soon as possible — early applications are often reviewed first.
Construction Scheduler
BB&E · 💰 USD 143K–185K
Apply for this role ↗

You'll be redirected to BB&E's official application page on workable.