Substation Construction Foreman at Southern Electric Corporation (SEC)

quanta· Field Operations/Craft Worker
Apply Now ↗
📍 Flowood, MS, USOTHER

About this role

About Us

Southern Electric Corporation a Quanta Services, Inc. (NYSE:PWR) company, is an electrical utility contractor specializing in the construction of high-voltage transmission lines, underground, and distribution lines as well as providing emergency restoration services.  A proven leader in the industry since 1985, SEC has earned a reputation of providing superior work with a strong focus on customer satisfaction and safety.  We currently manage over 100 crews and nearly 2,000 pieces of late model equipment.  Customers include investor-owned utilities, electric cooperatives, and municipalities throughout our work footprint.  Our team is our family.  We are 100% committed to the safety of our team members and providing industry leading training.  We believe we can be the last job you ever want to apply for.  Call us family!

About this Role

The Substation Construction Foreman is responsible for leading and managing crews in the construction of high-voltage electrical substations. This role focuses on overseeing installation of substation structures, bus work, high-voltage equipment, and associated systems in accordance with engineered drawings, safety standards, and customer requirements.

What You'll Do

  • Lead and coordinate daily work activities for construction crews, ensuring safety, quality, and productivity.
  • Install substation steel structures, bus work, and high-voltage equipment such as breakers, CCVTs, CTs, arrestors, disconnect switches, and transformers.
  • Install conduit, cable tray, wireways, and other raceway systems to support substation equipment.
  • Pull and terminate power, control, and grounding cables as required for substation operation.
  • Coordinate equipment deliveries, material staging, and proper use of tools and heavy equipment.
  • Interpret construction drawings, one-lines, schematics, and schedules to plan and sequence work.
  • Maintain crew discipline, provide on-the-job guidance, and ensure adherence to safety procedures.
  • Communicate daily with project managers, engineers, and safety personnel to address issues and track progress.
  • Complete daily reports and maintain accurate project documentation.

What You'll Bring

Knowledge, Experience, and Education:

  • High school diploma or equivalent required; technical training or completion of an electrical apprenticeship preferred.
  • Minimum of 5 years’ experience in high-voltage substation construction, with at least 2 years in a foreman or supervisory position.

Equal Opportunity Employer

All qualified applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, national origin or ancestry, sex (including gender, pregnancy, sexual orientation, and/or gender identity), age, disability, genetic information, veteran status, and/or any other basis protected by applicable federal, state or local law.We are an Equal Opportunity Employer, including disability and protected veteran status. We prohibit all types of discrimination and are committed to providing access and equal opportunity for individuals with disabilities. For additional information or if reasonable accommodation is needed to participate in the job application, interview, or hiring processes or to perform the essential functions of a position, please contact us the Company’s Human Resources department.

Frequently Asked Questions

Is the salary disclosed for the Substation Construction Foreman at Southern Electric Corporation (SEC) position at quanta?
The salary for this Substation Construction Foreman at Southern Electric Corporation (SEC) role at quanta is not publicly listed. Click "Apply Now" to learn more about the compensation package on their official careers page.
Where is the Substation Construction Foreman at Southern Electric Corporation (SEC) position at quanta located?
This Substation Construction Foreman at Southern Electric Corporation (SEC) role at quanta is based in Flowood, MS, US. The position is listed as on-site or hybrid. Check the full job description or apply directly to confirm the work arrangement.
Is the Substation Construction Foreman at Southern Electric Corporation (SEC) role at quanta full-time or part-time?
This is listed as a OTHER position. It is posted as a Substation Construction Foreman at Southern Electric Corporation (SEC) role in the Field Operations/Craft Worker department at quanta.
Which team or department does the Substation Construction Foreman at Southern Electric Corporation (SEC) at quanta belong to?
This Substation Construction Foreman at Southern Electric Corporation (SEC) position is part of the Field Operations/Craft Worker department at quanta. See the full job description for more information about the team structure and responsibilities.
How do I apply for the Substation Construction Foreman at Southern Electric Corporation (SEC) position at quanta?
Click the "Apply Now" button on this page. You will be redirected to quanta's official application portal hosted on icims where you can submit your application directly.
When was the Substation Construction Foreman at Southern Electric Corporation (SEC) job at quanta posted?
This Substation Construction Foreman at Southern Electric Corporation (SEC) position at quanta was posted on Jul 15, 2026. Apply as soon as possible — early applications are often reviewed first.
Substation Construction Foreman at Southern Electric Corporation (SEC)
quanta
Apply for this role ↗

You'll be redirected to quanta's official application page on icims.