Traveling Construction Scheduler- Mission Critical

shawmut· Mission Critical
Apply Now ↗
📍 Boston, MA, USFULL TIME💰 USD 120K–165K

About this role

Overview

At Shawmut Design and Construction, we take pride in the culture we’ve built as a 100% employee-owned company—one that’s been recognized with more than 100 Best Place to Work awards. We’ve been honored as a National Fortune Best Workplace, a Fortune Best Workplace for Women, Millennials, and Parents, and one of America’s Best Employers by Forbes—along with numerous regional recognitions across our 15 offices nationwide.

 

Here’s a glimpse into what we offer:

  • Health, Dental, and Vision Insurance.
  • Employee Stock Ownership Plan (ESOP) – Be an employee-owner!
  • 401(K) with Company Match – Receive a company match up to 4% of your eligible pay.
  • Generous Paid Time Off – vacation and sick time, 12 holidays, summer Fridays, and a yearly volunteer day.
  • The Extras – Cell phone, laptop, tuition reimbursement, pet insurance, financial planning services, and more.

Responsibilities

The Construction Scheduler is responsible for developing, maintaining, and analyzing project schedules for data center construction projects ranging from ground-up hyperscale campuses to fit-out and critical infrastructure upgrades. This role serves as the scheduling subject matter expert on the project team, providing reliable schedule data to support decision-making by Project Managers, Superintendents, and owner stakeholders.

 

The Scheduler works across all phases of a project – from pre-construction baseline development through turnover and closeout – integrating input from all trades to produce a comprehensive, resource-loaded critical path method (CPM) schedule that accurately reflects the complexity and sequencing demands of mission-critical facility construction.

 

Schedule Development & Maintenance

  • Develop and maintain detailed CPM project schedules using Primavera P6 and Smart PM, integrating all phases of work including civil/site, structural, architectural, mechanical, electrical, plumbing, fire protection, low-voltage, controls/BMS, and commissioning.
  • Build and maintain the project baseline schedule in coordination with the Project Manager, Superintendent, and key subcontractors; obtain owner approval and maintain a frozen baseline for variance tracking.
  • Produce and issue updated schedules on a weekly and monthly basis, incorporating actual progress, look-ahead windows, and revised logic as conditions warrant.
  • Develop and maintain a 3-week look-ahead schedule in coordination with the field Superintendent to drive near-term production planning.
  • Model and analyze schedule impacts of changes in scope, unforeseen conditions, design revisions, equipment delivery delays, and other project events.

 

Critical Path & Delay Analysis

  • Perform and maintain ongoing critical path analysis; identify float consumption, schedule compression, and emerging delays before they affect the project completion date.
  • Prepare Time Impact Analyses (TIAs) and schedule delay analyses in support of change order negotiations, owner claims, and dispute resolution.
  • Develop and evaluate schedule recovery plans, acceleration scenarios, and “what-if” analyses to support project management decisions.
  • Identify and communicate schedule risks proactively; recommend mitigation measures and track resolution.

Subcontractor & Trade Coordination

  • Solicit, review, and integrate subcontractor schedule input; challenge logic, durations, and sequencing assumptions to ensure schedule integrity across all trades.
  • Facilitate scheduling coordination meetings with subcontractors; drive accountability for schedule commitments and milestone adherence.
  • Coordinate with procurement and long-lead equipment tracking to incorporate generator, switchgear, UPS, chiller, cooling tower, and other critical equipment deliveries into the schedule.
  • Ensure commissioning and startup sequencing – including Cx agent, owner’s representative, and utility coordination milestones – are fully integrated into the schedule.

 

Reporting & Communication

  • Prepare and issue weekly schedule narrative reports summarizing project status, critical path, milestone performance, earned value (where applicable), and upcoming risks.
  • Develop schedule graphics, S-curves, milestone charts, and logic diagrams for owner presentations, executive briefings, and contract deliverables.
  • Support the Project Manager in presenting schedule status to ownership, hyperscale/colocation clients, and technical representatives.
  • Maintain a project schedule change log documenting all baseline revisions, logic changes, and owner-directed schedule modifications.

 

Pre-Construction & Proposal Support

  • Assist in the development of proposal schedules, bid schedules, and preliminary CPM schedules during the pursuit and pre-construction phases.
  • Participate in constructability reviews, phasing studies, and sequencing workshops to optimize project delivery strategy.Support contract schedule specification review; identify scheduling requirements and obligations during contract negotiation.

Qualifications

  • Experience: 5+ years of construction scheduling experience on large-scale industrial, or mission-critical projects; direct experience scheduling data center, semiconductor fab, pharmaceutical, or similarly complex MEP-intensive projects is strongly preferred.
  • Education: Bachelor’s degree in Construction Management, Civil Engineering, Mechanical Engineering, or a related field required; equivalent experience in lieu of degree considered.
  • Additional Role Specific Skills
    • Demonstrated experience developing and maintaining CPM schedules through all phases of construction, including commissioning and owner turnover.
    • Experience preparing Time Impact Analyses and supporting claims or change order negotiations is a plus.
    • Familiarity with data center infrastructure systems – including standby power (generators, UPS, ATS/STS, switchgear), cooling (chillers, cooling towers, CRAH/CRAC units, CRACs), BMS/DCIM, and structured cabling – sufficient to understand sequencing and interdependencies.
    • Expert proficiency in Oracle Primavera P6 (required); Microsoft Project proficiency a plus.
    • Proficiency in Bluebeam Revu for plan review and markup.
    • Working knowledge of Procore or similar construction management platforms.
    • Advanced Microsoft Excel skills; ability to build and manage schedule data exports, pivot analyses, and earned value tracking.
    • Experience with BIM/model-based scheduling (4D) and schedule integration with Autodesk Construction Cloud or similar platforms preferred.
    • Familiarity with Lean construction planning methodologies (Last Planner System) a plus.

EEO Information

Eligible candidates must be authorized to work in the United States without sponsorship or restriction, now and in the future. 

 

Shawmut prohibits discrimination against any staff member or applicant on the basis of race, color, sex, sexual orientation, gender identity/expression, age, religion, national origin, marital status, veteran status, pregnancy, physical or mental disability, genetic information, disability, creed, citizenship status, or any other legally protected characteristic.

Salary Range Information

U.S. Base Salary Range: $120K-$165K:  Placement within the listed range depends on many factors including, but not limited to geographic location, years of experience, project size capability (for Construction & Field roles) and internal company equity.

Frequently Asked Questions

What is the salary for the Traveling Construction Scheduler- Mission Critical role at shawmut?
The listed salary for this Traveling Construction Scheduler- Mission Critical position at shawmut is USD 120K–165K. This is an FULL TIME role.
Where is the Traveling Construction Scheduler- Mission Critical position at shawmut located?
This Traveling Construction Scheduler- Mission Critical role at shawmut is based in Boston, MA, US. The position is listed as on-site or hybrid. Check the full job description or apply directly to confirm the work arrangement.
Is the Traveling Construction Scheduler- Mission Critical role at shawmut full-time or part-time?
This is listed as a FULL TIME position. It is posted as a Traveling Construction Scheduler- Mission Critical role in the Mission Critical department at shawmut.
Which team or department does the Traveling Construction Scheduler- Mission Critical at shawmut belong to?
This Traveling Construction Scheduler- Mission Critical position is part of the Mission Critical department at shawmut. See the full job description for more information about the team structure and responsibilities.
How do I apply for the Traveling Construction Scheduler- Mission Critical position at shawmut?
Click the "Apply Now" button on this page. You will be redirected to shawmut's official application portal hosted on icims where you can submit your application directly.
When was the Traveling Construction Scheduler- Mission Critical job at shawmut posted?
This Traveling Construction Scheduler- Mission Critical position at shawmut was posted on May 21, 2026. Apply as soon as possible — early applications are often reviewed first.
Traveling Construction Scheduler- Mission Critical
shawmut · 💰 USD 120K–165K
Apply for this role ↗

You'll be redirected to shawmut's official application page on icims.